RAFT FLOOR SLABS
Getting earthworks right the first time and on time makes a big difference to the start of every construction project.

FAST FLOORS
BTS Earthworks uses Allied Concrete’s Ready Super Slab flooring system.
The raft flooring is CodeMark certified.
It is advantageous to use a raft foundation to achieve a stronger floor with minimal excavation requirements and it is suitable to use on softer earth.
Raft floors are fast to install, which accelerates the construction process and they have good thermal properties.
BTS Earthworks uses Ready Super Slabs in house, shed and smaller commercial builds – keeping the total project rocking along with current construction methods.